RETAING WALL TAKING SHAPE
finished pond with new liner, paving slabs and topsoil
#POND DESILTED,DITCH RE-PIPED, BACKFILLED AND LEVELLED
the moat beginning to fill.
the moat beginning to fill.
the finished pond
LAKE RESTORED AND READY FOR FILLING