This project involved the complete dredging and restoration of three ponds on a private property near Woodbridge, Suffolk. The works required careful coordination of specialist pumping equipment, heavy plant, vegetation clearance, silt management and final bank reinstatement.

Mobilisation and Dewatering

We transported our 4-inch industrial diesel pump to site together with all associated pipework, fittings and equipment. The pump was positioned centrally between the three ponds and the system was assembled and allowed to settle before operation. Once ready, water from all three ponds was pumped onto the client’s rear meadow.

Access and Vegetation Clearance

A 9-tonne dumper and our specialist excavator with wide steel tracks were mobilised to site. To create safe and practical access, our arborist worked with the wider team to remove the necessary trees and roots. The trunks were cut into manageable lengths for the client’s use, while branches and brushwood were transported by dumper to the client’s designated bonfire area and burned under controlled conditions.

Silt Containment Preparation

A 14-tonne standard excavator was delivered on a low-loader and tracked to the lower meadow. There, the topsoil was stripped and carefully stockpiled before a containment bund was formed from the underlying subsoil. This created a prepared area in which the dredged material could be safely placed.

Dredging Operations

The long-reach excavator then returned to the ponds and began removing accumulated silt, aquatic weed and debris. Material was loaded directly into the dumper and transported to the bunded containment area in the lower meadow.

Using the larger excavator in tandem with the smaller wide tracked excavator they worked from the pond bed , to remove the remaining deposits and continued to load the dumper.  This coordinated process was repeated across all three ponds.

Liner Removal and Bank Restoration

The existing liner was removed from the only lined pond and transported to a certified disposal facility. After dredging all three ponds we removed the topsoil between the three ponds and reshaped the three into a single large pond and stockpiled the topsoil for reuse. Laser levels were taken around the pond margins, enabling the team to reshape the banks accurately and achieve consistent, well-defined profiles.

Completion and Outcome

On completion, the immediate working areas were left as neat and tidy as site conditions allowed, and all plant and equipment were collected. The project successfully removed accumulated silt, weed and debris from each pond, restored the bank profiles and managed the excavated material within a purpose-built containment area on the property.

 