NEW E.P.D.M. LINER INSTALLATION

 

NEW E.P.D.M. LINER INSTALLATION

Blackmore end

A large garden pond was in need of a new liner and the removal of an island.

We had a small excavator and dumper delivered to the site.

The excavator was tracked to the bottom of the garden and the top soil was scraped back to allow the team to create a small bund in the corner of the garden.

The pond was then drained and we began excavating the reeds and plants.

The plants were separated and the healthier ones saved to one side.

All other plants, reeds and debris was loaded into the dumper.

The dumper was tracked to the bund and tipped the spoil.

The island was excavated, loaded into the dumper and tipped into the bund

The old liner and old timbers were removed and disposed of.

The banks were reshaped.

The bottom of the pond was then reshaped to create a shallow area.

The team then excavated a key trench around the circumference of the pond.

A new underlay and E.P.D.M. liner was then installed.

We started to fill the pond and The underlay and liner was secured in the key trench which we then backfilled with topsoil.

The bund was levelled out and the site was left in as clean and tidy a condition as possible. the new E.P.D.M. liner installation was now completed.

The plant was then collected.

http://mervynlambertplant.co.uk